Production manager — what you open

The advance is somebody else's and the call is somebody else's. Yours is the fortnight where a drawing turns into a room, with the crew, the gear and four vendors who each think they are first on the dock.

WhereSidebar > Build Ops > Build Schedule

  1. Build Schedule.

    The build as items with dates, owners and departments, and a status on each — done, in progress, blocked.

  2. The event gear list.

    What is coming, in which case, on which truck, and how much has actually been pulled.

  3. CrewOps By Event.

    The positions board for this show: what is needed, what is filled, what is still a hole with a date on it.

  4. The dock board.

    Trucks against doors and windows, shared with logistics rather than copied from them.

Build Schedule: twelve build items with dates, owners and departments, three done, two in progress and one blocked
Build Ops → Build Schedule. Twelve items with owners and departments — three done, two in progress, one blocked.